HAMS Garments Ltd. has reduced carbon dioxide emissions at its plant by 78.1% and received the World Championship for Energy Savings (WCES) Certificate, a recognition that also places the Bangladeshi apparel manufacturer among the leading contenders for the 2026 WCES Award.
The recognition highlights the company's efforts to improve energy performance and decarbonise an existing garment manufacturing facility through operational transformation, energy efficiency, renewable energy integration and continuous monitoring.
An operating plant, not a new build
The project covers an existing apparel manufacturing facility in Bangladesh with a gross floor area of 203,030 sq.ft. (18,861.95 m²) and approximately 3,216 regular occupants. Because the plant keeps running, its energy demand is substantial and continuous, driven by production activity, lighting, ventilation, cooling, compressed air, pumps, motors and other building and process systems.
Rather than replacing the facility, HAMS pursued a comprehensive operational transformation aimed at lowering consumption while maintaining production requirements and occupant conditions. The programme combined energy auditing, efficiency improvements, renewable energy, commissioning, metering, operational controls, preventive maintenance and staff engagement.
Results documented through certification
The effectiveness of the approach has been demonstrated independently through the building's LEED v4 Existing Buildings: Operations & Maintenance Platinum certification, awarded with 108 out of 110 points. The project recorded an overall energy saving of 75.25% and a renewable energy contribution of 47.36%, which the company presents as evidence of the decarbonisation potential available in existing industrial buildings.
Efficiency investments
HAMS implemented a coordinated package of energy-efficiency measures rather than relying on a single intervention. Investments were identified and prioritised through ASHRAE Level 1 and Level 2 energy audits and through ongoing assessment of building and production energy performance. Key measures included:
- Upgrading and optimising energy-consuming equipment and systems
- Improving lighting efficiency and reducing unnecessary electrical loads
- Optimising motors, pumps and other equipment
- Improving the performance of ventilation and cooling systems
- Strengthening energy metering and sub-metering to give greater visibility of consumption
- Installing a 550 kW on-site solar photovoltaic system
The solar array substantially reduces dependence on grid electricity and fossil-fuel-based energy; renewable sources now represent about 47.36% of the project's energy use. Together with the efficiency work, these measures underpin the reported 75.25% overall saving.
Technical optimisation
The physical investments are paired with an energy-management and operational optimisation system. Performance is monitored continuously through metering, equipment trend reviews and building-management practices, allowing the facility team to identify abnormal consumption and operational inefficiencies. Ongoing commissioning, preventive-maintenance planning, equipment performance monitoring and defined operational responsibilities form part of the routine, and energy use is reviewed periodically against expected performance so that corrective actions follow.
A demand response programme, including a 10% demand-reduction drill, demonstrates the facility's ability to actively manage electrical demand when the grid is under stress. Operating schedules and equipment use are also reviewed to minimise unnecessary loads while manufacturing requirements are maintained.
Engaging the workforce
HAMS states that technology alone cannot deliver lasting energy savings, so staff training, operational guidelines, employee engagement and responsible energy-use practices are built into the energy-management programme. Facility and maintenance personnel are trained in efficient operation, preventive maintenance, energy monitoring and corrective actions. Procedures encourage equipment to operate only when required, unnecessary loads to be switched off, and energy-intensive activities to be managed efficiently without compromising production, safety or occupant comfort. Structured action plans, assigned responsibilities and periodic performance reviews are used to maintain accountability.
The company positions this combination of technology, operational discipline and behavioural engagement as a replicable approach for the apparel sector — an argument that substantial energy savings can come not only from capital investment but from better operation, informed users and continuous performance management.